The Lobbying Register, read carefully Epicycle

Returns

Every filed return on the register. Filter, then open any return on lobbying.ie to read it in full.

Clear all

Showing returns filed by Q4PR .

Filed returns
2
match these filters
Matching filed returns per period 0 0 1 1 2 Sep–Dec 2025: 2 filed returns
Filed returns per four-month period Click a column to list its returns.
PeriodRegistrantPolicy areaSubject, as filedOfficials namedLink
Sep–Dec 2025 Q4PR Economic Development and Industry To update on VDC's operations in Ireland and timelines for delivery. To communicate the industry-wide position that the LEU connections policy will provide much-needed clarity to operators. (Public policy or programme) 1 On lobbying.ie
Sep–Dec 2025 Q4PR Energy and Natural Resources Call to discuss Fault Ride Through Proposal by Eirgrid which is the capability of the electricity generation system to remain connected during faults on grid (Public policy or programme) 1 On lobbying.ie

Policy areas in these returns

Public policy areaFiled returnsShareRelative to the largest
Economic Development and Industry 1 50.0%
Energy and Natural Resources 1 50.0%